Paladio Paladio
Estadio iluminado de noche junto a su modelo BIM en alambre

Frequently asked questions

A site logbook is a legal instrument, and handling public money demands even more: validity, security and a design that closes the door on discretion. These are the questions a builder and an authority must ask — answered head-on.

Site logbook

What does the site engineer have to do to fill the logbook?

Answer a chat. Eva, Paladio’s Concierge, messages him on WhatsApp at the end of the day and asks what the daily control sheet requires: activities per line item, crew, machinery, weather, quality. He replies with text, voice notes or photos — nothing to install, nothing to learn.

Voice is transcribed and the transcript stays inside the folio: every recorded quantity has its word-for-word backing.

Does this count as a bound, foliated logbook?

The folio replicates the daily control sheet of the bound book: sequential gapless numbering, the paper’s boxes, attached evidence and both signatures — resident and inspector — each with their license number. A day with no activity is recorded too, so the book has no gaps to explain later.

The inspector signs with a one-time code sent to their WhatsApp: licensed identity, timestamp, and a folio that becomes read-only.

What if the engineer reports a quantity that doesn’t add up?

Eva, Paladio’s Concierge, compares every quantity against the budget and historical production rates and flags outliers — “masonry logged 45 m² today against a usual pace of 28” — so the inspector looks before signing. The decision is always the inspector’s; Eva only says where to look.

Where do the progress and cost charts come from?

From the folios and each line item’s unit price analysis. When a diary is recorded, progress against plan, cost composition and material consumption recompute themselves. No chart is ever typed in — if a number is on screen, there is a signed folio behind it.

Data & security

Does the data belong to Paladio or to the contracting authority?

To the authority. Always. Drawings, budgets, estimates, evidence and logs belong to the contracting authority; Paladio is the technical custodian, not the owner.

Everything is exportable in open formats (PDF for certificates and reports, structured data for the authority’s own systems). If the authority decides to leave, it takes its complete file — no hostages.

How protected is the information?

Encryption in transit and at rest, role-based access control (analysts don’t approve, inspectors don’t edit budgets, comptrollers only read) and strengthened authentication for signing roles.

Automatic backups with authority-defined retention, and a record of every access to the file: you also know who looked, not just who signed.

Security is a design commitment from day one — not a sticker added at the end. Deployment details (cloud or the authority’s own infrastructure) are defined with each institution.

Is our authority’s data mixed with other authorities’?

No. Each authority operates in an isolated space: its data never crosses with other institutions’ nor is used for anything beyond its own operation.

Financial control & audit

How does this reduce corruption?

Corruption in construction feeds on opacity and discretion. Paladio attacks both by design: segregation of duties (whoever uploads doesn’t approve; whoever approves is on record), amounts tied to verifiable physical elements and mandatory evidence anchored to every line item.

The log is immutable: approvals, objections, comments and changes are written with author, date and content — no silent edits, no files reconstructed for convenience.

Financial control stops being reactive: overrun alerts before approval, double billing visible on the model and actual-vs-planned deviations that expose the problem while it can still be fixed.

Can it be audited in real time?

Yes. The comptroller, control body or funder gets read-only access to the living file: every estimate, every approval and every piece of evidence, the moment it happens. No boxes to request, no waiting for the fiscal year to close.

That access is strictly read-only: auditors can view, filter and export, but cannot modify the file or alter the log.

How deep does traceability go?

From the portfolio to the rebar: from the authority’s total released amount, to the project, to the estimate, to the line item, to the element in the 3D model, down to its material sheet with standard and quality control. Any portfolio figure can be opened to the element that backs it.

Implementation & product

What do we need to hand over to start?

For the logbook: the itemized budget, the unit price analyses if you have them —they can be uploaded later, per chapter— and the site engineer’s WhatsApp. With that the project starts recording the same day.

DWG drawings or BIM models add the visual layer: the pipeline turns CAD layers into 3D elements grouped by trade. Welcome, but not a requirement to start.

Does the contractor also use Paladio?

Yes. The contractor submits the estimate with quantities, photo evidence and supporting documents per line item; the inspector reviews it on the model and both discuss inside the same file. Fewer back-and-forths and shorter payment cycles.

What exactly does Paladio AI do, and who decides?

The AI cross-checks the 3D model, the budget, the estimate history and the photo evidence, and produces a pre-analysis: items at overrun risk, incomplete evidence and atypical quantities.

The decision is always human. The AI points to where to look; the inspector approves, objects and signs.

What stage is the product at?

The site logbook is the heart of the product and it is real today: folios over WhatsApp, licensed signatures, the budget with its unit price analyses and metrics that compute themselves. The 3D digital twin and AI-assisted estimate reading are where the platform is headed, shown as what they are: the roadmap. Figures on this site are demonstration data.

Still have a question? Let’s talk in a demo →

The next folio fills itself. Start today.

Request a demo