Paladio Paladio
Felipe Arancibia
Author

Felipe Arancibia

Sr. Product Designer

Chilean, designing for Latin America. Field research surfaces what actually matters to clients, and that becomes products non-technical people adopt on their own — legal, education, accounting — and that show up in productivity from week one.

LinkedIn
20 articles Writes about Productivity · Costs · Site logbook · Guides · Construction tech
Nocturnal coloured-pencil illustration of a dim cobbled street, with a man in a white apron standing under a shop awning, reading a sheet of paper closely by the light of the street lamp, while behind him a blurred figure waits in the shadow and the façades beyond light up their windows
Productivity

Construction scheduling: how to build a programme that is actually worth something

Critical path, float and baseline without the jargon. How a construction programme is built, why most are useless and what to do when reality drifts.

Orientalist painting of a white-bearded merchant in a crimson robe, mounted on a white horse in red harness before the tiled arches of a bazaar, while a man in pink raises both hands to hand him a rolled paper and the traders seated to one side look on
Productivity

Supply on site: why the material does not arrive and how to stop losing days

Missing material is the number one cause of days lost on site. Where the chain really breaks, when to order, and what to record so you do not pay for the delay.

Mexican painting in ochres and earth tones of a row of women in profile, dressed in white, carrying baskets brimming with flowers on their heads while holding in their arms the ones that no longer fit, against a band of blue sky with agave leaves at either edge
Costs

The site store and waste: where the material you actually bought goes

Material that is bought and never becomes finished work is a silent loss. The five causes of overconsumption and how to tell them apart in time.

Victorian oil painting of a formal visit: a woman in mourning dress hands a sealed letter to an elderly man seated at his writing desk, the day’s papers open on its leaf
Site logbook

The site logbook and service orders in Argentina: the record that decides arguments

In Argentina the site record is built from the inspection's service orders and the contractor's request notes. How the circuit works and why it decides disputes.

Oil painting in the style of the American night diner: three customers wait leaning on the counter of a brightly lit establishment in the middle of the night, served by a single attendant in white, seen from the empty street through the glass
Costs

Works certification in Argentina: how the certificado is built and why it gets flagged

The certificado de obra is the instrument used to bill progress on a works contract in Argentina. What it contains, what backing the inspection demands and why it bounces.

Japanese woodblock print by Hiroshige at the Sayo no Nakayama pass; a group of travellers arrives from the right pointing at the stone by the road while others walk away to the left, and the stone stays between them holding a story that only passes by word of mouth
Productivity

Changing site engineer mid-project: how not to lose the information

When the site engineer changes, the project loses months of context that lived in their head. What is lost, what survives and how to run a handover that works.

Baroque painting by Velázquez of three musicians singing and playing around a table, absorbed in the music and looking upward, while in the shadows at the left edge a monkey helps itself to the food without anyone noticing
Productivity

The seven signs a project is going to lose money, months before anyone notices

A project rarely goes under all at once. The seven early signs that show up weeks before the numbers confirm it, and what to look at in each one.

Orientalist oil painting in ochres and whites; a rider with a rifle slung across his back stops at a workshop door without dismounting from his white horse, while the owner and a servant each get on with their own work
Productivity

How to run five sites at once without living in the pickup

Running several sites at once fails by design, not for lack of effort. What information a construction director needs, how often, and what can be delegated.

Japanese woodblock print in burnt orange, indigo and cream; a carrier pigeon crosses a sky of rolling clouds with a rolled sheet of paper tied to its feet, and below it rises the concrete frame of a building under construction with its tower crane
Site logbook

The site logbook in Chile: what the OGUC requires and who signs each entry

In Chile the libro de obras is compulsory and forms part of the official project file. What the OGUC requires, what the cover page must carry and who may write in it.

Japanese woodblock print in burnt orange, indigo and cream over a wave pattern; a worker in a hard hat files papers one by one into a cabinet of open drawers while a storm of loose documents and speech bubbles blows in from the other side
Costs

Payment applications in Chile: how they are put together and why they get rejected

In Chile the estado de pago is the periodic claim for progress under a construction contract. What it must contain, how it is calculated and the concrete reasons the ITO raises observations.

Coloured-pencil illustration on tan paper; in a workshop with tall windows, a worker in a hard hat sits on a crate and writes in his notebook the readings of a large brass machine covered in pressure gauges, gears and levers
Costs

Quantity measurement on site: method, criteria and the errors that cost most

Cubicar means measuring and quantifying the items of a job. The method, the measurement criteria to settle before you start and the errors you pay for when you claim.

Pen-and-ink illustration with watercolour washes in sepia, dusty rose and pale teal; on a hilltop at dawn a man in a hard hat raises a lit lantern, and up the slopes a dozen workers in hard hats climb towards the light through tall grass and scrub
Guides

The ITO on site in Chile: what powers it really has and how to work with inspection

In Chile the inspector técnico de obra checks the work against the permit and the codes, and is subsidiarily liable alongside the builder. What it can and cannot do.

Vintage editorial engraving in sepia, ochre and teal on aged paper; a photographer in a hard hat leans under the cloth of a bellows camera on a tripod to record the crack running down a concrete wall, and at his feet waits a stack of already exposed glass plates
Costs

Price adjustment in Chilean construction contracts: how it works and what to check before signing

In Chile price adjustment shields the contractor from price movement during execution. The usual mechanisms, what to check in the clause and the common calculation errors.

Vintage colored-pencil illustration of an enormous ornate brass machine covered in gauges, levers and gears, clearly elaborate and clearly idle; beside it, a workman in a hard hat sits on a crate writing in a small worn pocket notebook, ignoring the machine entirely
Construction tech

Why construction software fails in the field, and what actually works

Most construction software rollouts fail for the same reason, and it is not missing features. What actually breaks, and what field crews really adopt.

Vintage editorial engraving of a mechanical automaton in a hard hat holding a plumb bob against a wall with perfect precision; its lower half is drawn solid and detailed in brass clockwork, while its upper half gradually dissolves into loose hatching and smoke fading into the sky
Construction tech

AI in construction: what works on site today, and what is still smoke

An honest assessment of artificial intelligence applied to construction: what is mature, what is halfway there, and what gets sold but does not work.

Edwardian pen-and-ink and watercolour illustration of a colossal site logbook standing open like a folding screen in the middle of a construction yard; on the left a resident engineer in a hard hat writes on his page and on the right, mirrored, a supervisor writes on his, neither seeing the other, with scaffolding and a half-built wall behind
Site logbook

The site logbook in Peru: what changed with Law 32069 and the cuaderno de incidencias

In Peru the cuaderno de obra became the cuaderno de incidencias under Law 32069. What changed, who records entries and what each entry must contain.

Japanese woodblock print of a remote construction site on a bare plateau at dusk, with a half-built concrete frame and a single crane; a carrier pigeon takes flight from the top of the structure with a small rolled paper tied to its leg, against a sky of decorative clouds
Construction tech

Digitising a site with no connectivity: what works offline and what does not

Poor signal is the first objection on any site. Which architectures hold up without connectivity, which do not, and how to test that before you buy.

Vintage editorial engraving of a photographer in a hard hat documenting a crack running across a concrete wall with a large bellows camera on a wooden tripod; at his feet, a neat stack of glass plate negatives
Productivity

How to document a site event that may end up as a claim

What to record the moment something goes wrong, so it still works months later. The events you must document and what the record has to contain.

Edwardian pen-and-ink and watercolour illustration of a hillside at dusk; at the top a foreman in a hard hat holds a lantern whose light reaches only a few, while a dozen workers scatter down the slope, each heading a different way
Productivity

How to keep track of subcontractors without chasing them on WhatsApp

Subcontractor follow-up fails by design, not for lack of nagging. What to require, how often, and how to build it into the contract from day one.

Coloured-pencil illustration on tan paper of a hard-hatted site engineer at a desk inside a site hut, almost buried under an avalanche of paperwork spilling onto the floor; through the window behind him the site is in full daylight, crane and workers, with nobody supervising it
Productivity

A site engineer's real day: where the time actually goes

Hour by hour, where a site engineer's day goes. How much is technical supervision, how much is admin, and which part of it can be won back.

← All articles

The next folio fills itself. Start today.

Request a demo