Felipe Arancibia
Sr. Product Designer
Chilean, designing for Latin America. Field research surfaces what actually matters to clients, and that becomes products non-technical people adopt on their own — legal, education, accounting — and that show up in productivity from week one.
LinkedIn
Construction scheduling: how to build a programme that is actually worth something
Critical path, float and baseline without the jargon. How a construction programme is built, why most are useless and what to do when reality drifts.
Supply on site: why the material does not arrive and how to stop losing days
Missing material is the number one cause of days lost on site. Where the chain really breaks, when to order, and what to record so you do not pay for the delay.
The site store and waste: where the material you actually bought goes
Material that is bought and never becomes finished work is a silent loss. The five causes of overconsumption and how to tell them apart in time.
The site logbook and service orders in Argentina: the record that decides arguments
In Argentina the site record is built from the inspection's service orders and the contractor's request notes. How the circuit works and why it decides disputes.
Works certification in Argentina: how the certificado is built and why it gets flagged
The certificado de obra is the instrument used to bill progress on a works contract in Argentina. What it contains, what backing the inspection demands and why it bounces.
Changing site engineer mid-project: how not to lose the information
When the site engineer changes, the project loses months of context that lived in their head. What is lost, what survives and how to run a handover that works.
The seven signs a project is going to lose money, months before anyone notices
A project rarely goes under all at once. The seven early signs that show up weeks before the numbers confirm it, and what to look at in each one.
How to run five sites at once without living in the pickup
Running several sites at once fails by design, not for lack of effort. What information a construction director needs, how often, and what can be delegated.
The site logbook in Chile: what the OGUC requires and who signs each entry
In Chile the libro de obras is compulsory and forms part of the official project file. What the OGUC requires, what the cover page must carry and who may write in it.
Payment applications in Chile: how they are put together and why they get rejected
In Chile the estado de pago is the periodic claim for progress under a construction contract. What it must contain, how it is calculated and the concrete reasons the ITO raises observations.
Quantity measurement on site: method, criteria and the errors that cost most
Cubicar means measuring and quantifying the items of a job. The method, the measurement criteria to settle before you start and the errors you pay for when you claim.
The ITO on site in Chile: what powers it really has and how to work with inspection
In Chile the inspector técnico de obra checks the work against the permit and the codes, and is subsidiarily liable alongside the builder. What it can and cannot do.
Price adjustment in Chilean construction contracts: how it works and what to check before signing
In Chile price adjustment shields the contractor from price movement during execution. The usual mechanisms, what to check in the clause and the common calculation errors.
Why construction software fails in the field, and what actually works
Most construction software rollouts fail for the same reason, and it is not missing features. What actually breaks, and what field crews really adopt.
AI in construction: what works on site today, and what is still smoke
An honest assessment of artificial intelligence applied to construction: what is mature, what is halfway there, and what gets sold but does not work.
The site logbook in Peru: what changed with Law 32069 and the cuaderno de incidencias
In Peru the cuaderno de obra became the cuaderno de incidencias under Law 32069. What changed, who records entries and what each entry must contain.
Digitising a site with no connectivity: what works offline and what does not
Poor signal is the first objection on any site. Which architectures hold up without connectivity, which do not, and how to test that before you buy.
How to document a site event that may end up as a claim
What to record the moment something goes wrong, so it still works months later. The events you must document and what the record has to contain.
How to keep track of subcontractors without chasing them on WhatsApp
Subcontractor follow-up fails by design, not for lack of nagging. What to require, how often, and how to build it into the contract from day one.
A site engineer's real day: where the time actually goes
Hour by hour, where a site engineer's day goes. How much is technical supervision, how much is admin, and which part of it can be won back.