Guides
Step-by-step guides to the paperwork that holds a project together: which document is needed, what it must contain and why it gets sent back.
Accident on site: what to do in the first hours and what gets recorded
The first hours after a site accident: care, securing the scene, notification within the deadline and investigation. Plus the deadlines in Mexico, Chile and Peru.
Interventoría and supervision in Colombia: who oversees your contract, and with what powers
In Colombia a public contract is overseen by a supervisor or an interventor, and they are not the same. What each one does and what liability each one carries.
Construction audit: what they will ask for and how to be ready
A construction audit checks whether what was claimed matches what was built, and whether it is supported. What documents they ask for, how to organise them and what to do if something is missing.
The ITO on site in Chile: what powers it really has and how to work with inspection
In Chile the inspector técnico de obra checks the work against the permit and the codes, and is subsidiarily liable alongside the builder. What it can and cannot do.
What must a construction payment estimate contain? (and why review it in 3D)
The minimum supporting documents of a construction payment estimate in Venezuela, the most common review mistakes and how a 3D digital twin changes it.