Carlos Pérez (Comandos)
CEO of Paladio
Founder and CEO of Paladio. He has spent more than 15 years building financial products that touch the lives of millions of people. He writes about what he sees on site: how progress is really measured and where the money leaks.
LinkedIn
Unit prices or lump sum: what changes and who carries which risk
The difference between unit prices and lump sum is not a matter of format: it decides who carries the quantity risk. Pros, cons and when each one fits.
Price redetermination in Argentina: how it works and why filing late loses money
Redetermination keeps a public works contract economically balanced against price variation. How the national regime works and the deadlines you must meet.
Interventoría and supervision in Colombia: who oversees your contract, and with what powers
In Colombia a public contract is overseen by a supervisor or an interventor, and they are not the same. What each one does and what liability each one carries.
The site logbook in Colombia: what to record and why it decides disputes
In Colombia the site logbook is mainly a contractual requirement. What to record, who signs and why it is the document that decides disputes at settlement.
Actas parciales in Colombia: what evidence they require and why they get returned
The acta parcial is the document used to bill progress on a works contract in Colombia. What it contains, what evidence the interventoría demands and why it bounces.
Construction audit: what they will ask for and how to be ready
A construction audit checks whether what was claimed matches what was built, and whether it is supported. What documents they ask for, how to organise them and what to do if something is missing.
Extraordinary unit prices in Mexico: when they apply and how they get approved
An extraordinary price is set for an item not contemplated in the original schedule. When it applies in Mexican public works, how it is built up and why it gets rejected.
Time extensions on Mexican public works: how to request one and what backup it takes
In Mexico a time extension is formalised through a convenio, and it is won or lost on the backup gathered at the time. What to document and how to file it.
Cost adjustment on Mexican public works: when it applies and how it is calculated
In Mexico, cost adjustment applies when unforeseen economic circumstances alter the cost of work not yet executed. The three LOPSRM procedures and how to file.
WhatsApp on the construction site: from group chaos to structured data
WhatsApp is already the operating system of construction sites in Latin America. The problem is not the channel: it is that information dies there. What can be structured, and how.
Giving your site logbook evidentiary weight: folios, signatures and certain date
What turns a site record into evidence: tamper-evidence, sequential folios, certain date and acknowledgment by the parties. Plus the contract clause that holds it all up.
The construction logbook in Mexico: what the law requires and how to keep it error-free
In Mexico the bitácora is mandatory on federal public works and kept in BESOP. What the law requires, who signs and which mistakes void a note.
What the site logbook is: a guide for site engineers in Latin America
The formal instrument of communication between the parties to a construction contract. What it is, who signs it and what it is called in each country.
The S-curve: how to read it and what to do when you fall behind schedule
The S-curve compares planned progress against actual progress over time. How it is built, what the gap means and which decisions to take when it appears.
How to calculate a project's delay and forecast the real completion date
Three methods for turning "we are behind" into a defensible number and a forecast date, with their assumptions and their limits.
Measurement backup sheets: what they are and how to stop your claim being rejected
In Mexico the generador de obra proves how every quantity you bill was measured. What it must contain and why the supervisor sends it back.
Why payment runs late on construction projects and how to shorten the cycle
Late payment on a construction project rarely starts with the client. Where the chain between doing the work and getting paid actually breaks, and how to shorten it.
Estimación, valorización, estado de pago, certificación: one concept, five names
Construction vocabulary changes in every country of the region. A dictionary of equivalences across Mexico, Peru, Chile, Colombia and Argentina, with the differences that are not just about the name.
How to build a unit-price analysis step by step
A unit-price analysis breaks the price of a line item into materials, labour, equipment and overheads. How each component is built, with a full worked example.
Budgeted vs actual productivity: why there is always a gap
Budgeted productivity is an average under standard conditions. The actual figure almost never matches. How much of a gap is normal, and when it stops being normal.
How to measure a crew's actual productivity
A crew's actual productivity is measured by dividing the quantity executed by the crew-days spent on it. The formula, a full worked example and the mistakes that distort it.
What must a construction payment estimate contain? (and why review it in 3D)
The minimum supporting documents of a construction payment estimate in Venezuela, the most common review mistakes and how a 3D digital twin changes it.